UPDATE
Jan 12, 2023, 08.45 AM
9 elevated metro stations at Sholinganallur Lake-I, Sri Ponniamman Temple (Sholinganallur Lake-II), Sathyabama University (Semmeancheri-I),
Rail Vikas Nigam (RVNL) stated that it has received Letter of Acceptance (LoA) from Chennai Metro Rail for Construction of elevated viaduct (Around length of 10 Km),
Semmeancheri-II, Gandhi Nagar, Navallur, Siruseri, Siruseri SIPCOT-1 and Siruseri SIPCOT-2 and stabling viaduct at SIPCOT. The accepted contract amount is Rs 1134.11 crore (including GST and provisional sum).
UP NEXT
Read Next